Correct Thermal shock test chamber installation
Correct Thermal shock test chamber installation
Thermal Shock Test Chamber from Reale |
As the product quality requirements have increased, users of the use of thermal shock test chambers have gradually grown. Gradually the use of test chambers is getting higher and higher, but the relative troubles of the test chambers are getting more and more, and there is no way to use them as easily as before. It seems that every time the factory is relocated, how to properly install the test box and maintain the test box will be full of doubts. Some users have called us to say: Our factory has to be relocated, how should my test chamber be properly installed? The following is to popularize the correct installation of the thermal shock test box from Huanrui Test:
1. The thermal shock test chamber can not be installed upside down, and must be placed on the floor levelly, so that the operation door of the temperature test box can be opened easily, reducing the noise during mechanical operation;
2. Maintaining good ventilation space is one of the installation environment requirements of the test box. The purpose is to let the cold suspect function to dissipate heat, and avoid direct sunlight. Do not approach the heating element such as the stove, so as not to affect the cooling effect;
3. Be sure to use the special switch for the power switch. Do not use the cord of the common SW plug with other electrical machinery. Do not place the floor or supermarket place to avoid stepping on or leaking electricity;
4. The inner and outer materials of the test box power switch are made of high-grade stainless steel, but the wet water is easy to make the parts and electronic control center, which has no adverse effects and reduces efficiency. It should be avoided as much as possible;
5. The hot and cold impact test chamber should be kept clean at any time. When the outer box is clean, apply a little varnish; polish with a soft cadre;
6. When working in the test chamber, the test chambers should be kept closed to avoid water mist in the box.
The above six items are necessary work in accordance with the thermal shock test chamber. Do not bother to ensure the safety of the test. Specification is the key work
评论
发表评论